- Client: CHEO
- Value: $3,885,000
- Size: 4,000 sq. ft.
- Location: 401 Smyth Road, Ottawa, ON
- Completion Date: 2022
- Industry: Healthcare
- Delivery Method: Lump Sum
The CHEO Catheterization, Interventional Radiology, and Simulation Lab Redevelopment renewed specialized clinical space within the Children’s Hospital of Eastern Ontario, creating modern environments for pediatric interventional radiology, cardiac catheterization, and simulation-based medical training. Located at CHEO’s main campus on Smyth Road, the project involved renovating existing hospital space to accommodate new laboratory and clinical units.
HEIN delivered the project as General Contractor, completing the renovation over multiple phases while the hospital remained fully operational. The work extended beyond the immediate renovation areas, with upgrades and modifications to mechanical and electrical systems affecting several areas throughout the hospital. Careful coordination was required to maintain access, clinical workflows, and continuity of hospital operations throughout construction.
The redevelopment replaced aging clinical infrastructure with advanced imaging and procedure technology designed to improve safety, speed, and access to specialized pediatric care. The new IR/Cath Lab supports interventional radiology and cardiac catheterization procedures, while the Simulation Lab provides health-care teams and learners with a realistic environment to train, practise complex scenarios, and improve patient care.
Infection prevention and control was a critical consideration throughout the project due to the proximity of sensitive treatment and patient care areas. HEIN coordinated phased access, containment measures, specialized room requirements, ceiling-mounted systems, structural supports, mechanical and electrical integration, equipment installation, and final commissioning within an environment where cleanliness, precision, and uninterrupted care were essential.
Substantially completed in July 2022 and publicly opened later that year, the CHEO IR/Cath and Sim Lab now supports advanced pediatric procedures, clinical training, and specialized care. The project demonstrates HEIN’s experience delivering complex healthcare renovations that require careful coordination of construction, building systems, infection control, clinical technology, and active hospital operations.










